-
Swimming Pool of Alvalade Hotel
-
Retention Basin of Viana Operational Pole
Assembling of recirculation and drainage system of Retention Basin of Viana Operational Pole.
See more » -
Dinette Building
-
Municipal Swimming Pools
Redevelopment of a municipal swimming pool in N’dalatando and construction of a new one whit 25x14m.
See more » -
Water Treatment System – Imoluanda Condominium
-
WWTP
Installation of Wastewater treatment plan with tertiary treatment at the Shipyard of Viana.
See more » -
Water Treatment System – Alvalade Hotel
-
Swimming Pool of Terminus Lobito Hotel
Supply, equipment assembly, waterproofing and coating of the Terminus Lobito Hotel swimming pool.
See more » -
WWTP Maintenance and Technical Assistance
-
Water Treatment System – President’s Hotel